SFS external infill, structural studwork and shaft walls for main contractors across London and the home counties. Hadley, Metsec and equivalent systems installed to the engineer’s drawings, with deflection heads, fire stopping interfaces and acoustic detailing built right the first time.

Panelised and stick-built SFS infill between slabs, set out from gridlines and installed to the system manufacturer’s span tables and the project engineer’s details.
Load-bearing studwork, lift shaft and riser walls in fire-rated build-ups, coordinated with the frame contractor so following trades are never held up.
Slotted deflection heads, movement joints and slab-edge closures detailed properly, because that is where bad SFS jobs fail their inspections.
Setting-out checks, fixing schedules and photo records filed to the project drive, ready for the clerk of works before sign-off is requested.
Hadley, Metsec and equivalent steel framing systems, installed to the manufacturer’s tables and the project engineer’s drawings. If your specification names a system we have not carried before, we will confirm training and warranty cover with the manufacturer before we price it.
Yes, that is how most of our SFS work arrives. Send the architect’s and engineer’s drawings over and we will return a fixed price with a programme fit inside five working days.
Always. SFS sits between the frame and the cladding, so we attend coordination meetings, agree interface details up front and sequence floor by floor with the facade contractor’s programme.
Steel Framing Systems (SFS) or the full internal package. Drop the drawings in and we'll come back inside five working days with a fixed price and a programme fit.
Drawings welcome. Anything missing, we'll come back with a question, not a guess.
Your enquiry has been sent. We'll come back to you within one working day.