Rotar Interior runs the full internal package on commercial fit-outs across London and the home counties. Partitions, ceilings, tape and joint. Built to spec, signed off first time.







Drawings priced inside 5 working days. We sit the package against your master programme, flag anything that won't sequence, and lock the labour curve before site start.
Named supervisor on every shift. RAMS issued before mobilisation, daily diaries and photo logs filed to the project drive, weekly progress meeting with the package manager.
Each room walked off internally before it goes to the contractor's clerk of works. Snag list closed before follow-on trades arrive. We don't leave a floor open behind us.
Rotar took the drylining package off our hands across three blocks. The site was clean, the boards were straight, and the finish was signed off without a snag list to chase. That's rare on a residential job this size.
Full cover for commercial fit-out works, with employer's and contractor's all-risk on file.
Every operative carries a current CSCS card. Supervisors hold gold or black; SSSTS & SMSTS as required.
Installed to Hadley, Metsec, British Gypsum, Knauf and Siniat specs. Warranties carried where required.
Daily diary, photo log and progress curve filed to the project drive. Weekly written report on request.
Drylining, SFS, ceilings, tape & joint or labour. Drop the package in and we'll come back inside five working days with a fixed price and a programme fit.
Drawings welcome. Anything missing, we'll come back with a question, not a guess.
Your enquiry has been sent. We'll come back to you within one working day.